Met with Naseem and worked on Project schedule. we used Microsoft project.
01/14/2012:
modifying extension cables for servomotor
1. get extension cables (white,red,black)
2. go to male end of plug
3. use a wire cutter to snip the male end off leaving the three wires.
4. use wire strippers to get to the actual wire.
5. use a soldering iron to tin all 3 tips of the extension cables (preparation to soldering)
6. tin 3 jumper wire (preparation to soldering)
7. solder the one jumper cable to each cable (W,R,B)
8. cut heat shrink
9. place heat shrink over connection
10. use a heat gun to heat up the heat shrink. the heat shrink melts and create a nice seal over your connection.
Guys,
ReplyDeleteThe most important part of documentation is one of the pillars in science: REPRODUCIBILITY.
The list on this post can be given to 100 people, not one would know what to do, how to do it and why each step is done. Without photos, diagrams and detailed explanations, you will have problems with the technical documentation aspect of the project which is a good part of your grade.
Also, each day should have its own post. If you created a project schedule why isn't a PDF posted here?